首页 > Canton Fair Data (广交会买家名录) > 广交会买家名录
  Quote Request
  发布时间: 2024-6-28 浏览:6
 
发 布 人:todaytex    发布人电子邮件:1407106692@qq.com
联系网址:http://www.todaytex.com

公司:Quote Request
国家:**
联系人:**
地址: This is an inquiry message about Quote Request in the 108th China Canton Fair. (这是一条买家关于"Quote Request"的询盘信息,来自第108届中国广交会。)Inquiry Message (询盘信息) Quote Request Here within are specifications for quotation to supply Wellman Products Group Medina facility with qty (1) convection heated drying oven. The guidelines put forth are to be used as reference to meet Wellman’s criteria for a new conveyor type drying oven. Deviations from these recommendations are to be approved by both parties prior to construction approval. The machine design and performance is the sole responsibility of the manufacturer. It is the responsibility of the manufacturer to meet all applicable safety standards for the country of destination for all components of the equipment prior to acceptance to ship, this includes but is not limited to CE, UL, NEC, ANSI, ISO, IEC and OSHA standards. The product will be loaded by our upstream equipment (roller coater) onto the wire mesh oven conveyor. The product is processed through the continuous single-pass drying system and manually unloaded from the oven conveyor. CONVEYOR TYPE DRYING OVEN SPECIFICATIONS ELECTRICAL POWER: 480V THREE PHASE 60HZ CONTROL VOLTAGE 115V WITH IEC CONTROLS: ALLEN BRADLEY OR AGREED UPON EQUIVALENT OPERATOR INTERFACE: ALLEN BRADLEY OR AGREED UPON EQUIVALENT HEATING METHOD: NATURAL GAS 1. Design temperature: 500°F. 2. Belt material to be open wire at 60-inches wide w/ pin point attachments. 3. Load (weight) – minimum 1 lb. /ft2 with a target of 1.5 lbs. /ft2. 4. Solvent evaporation rate of 3 lbs. /hr (MEK). 5. Speed 5-20 FPM w/ digital readout calibrated to FPM and ability to synchronize with coating equipment. 6. Convection air flow at 30,000 CFM minimum with adjustable baffles to obtain uniformity. 7. Cooling zone with adequate air to reduce temperature of parts to minimum of 20°F above ambient 8. Heat chamber to be a minimum of 30 ft. long and cooling 10 ft. and the load and unload tables at 5 ft. each. 9. Heat accuracy throughout heat zone to be +/- 5°F across entire belt. 10. Thermal couple test ports on panel door. 11. Independent thermal couples to plugs on panel door. 12. All electrical will be housed in oil/dust tight fused disconnect panel. 13. Control voltage transformers to be included in panel. 14. Electrical systems at a minimum must meet NFPA applicable standards. 15. Overall equipment layout to be submitted for design approval sign-off prior to fabrication 16. Control panel layout to be submitted for design approval sign-off prior to fabrication 17. Overall electrical schematic submitted for design approval sign-off prior to fabrication GENERAL CONSTRUCTION 1 Overall design layout submitted for design approval sign-off prior to fabrication 2 All exposed steel components to be painted, with international safety colors where applicable and overall color per instructions from individual ordering facility unless otherwise specified ACCEPTANCE CONDITIONS 1 Biweekly project updates to be submitted in either MS Project or other accepted method to Project Manager, Director of Purchasing and Director of Engineering. 2 All utility requirements must be specified prior to signed shipping acceptance. 3 Any special handling and or packaging requirements must be specified in writing prior to signed shipping acceptance. 4 All manuals and prints to be supplied in both paper and electronic form prior to final acceptance. 5 Operational runoff of minimum of 4 hours continuous operation, must take place at manufactures facility prior to signed shipping acceptance. 6 After operational run a temperature grid check will be performed to validate distribution prior to signed shipping acceptance. 7 During the runoff WPG personnel will process a predetermined number of pieces for equipment validation. 8 Manufacturer will supply installation/startup assistance at the machines installation site. 9 Minimum of 2 day start-up and training on site prior to signed final acceptance. 10 Operational runoff will take place at operating facility prior to signed final acceptance. Delivery target date of 12/1/08 Contact Info (联系信息) Rob Lynch OH 44256 USA Company: Wellman Products Group E-mail: rlynch@wellmanproducts.com rlynch@wellmanproducts.com
电话:**
传真: **

邮箱:**
网址:**


采购本类产品及:**
最新信息
·(真免费)在线查询有采购记录的国外买家
·* Buyer国际买家信息网 *
·(跨国采购)跨国采购采购商
·免费提供海量海外买家名录信息
·世界买家资料频道|最新买家资料
·买家网(百万)买家信息网