| 首页 > Canton Fair Data (广交会买家名录) > 广交会采购商名录 | |||
| QUOTE | |||
| 发布时间: 2024-6-28 浏览:7 | |||
|
发 布 人:todaytex 发布人电子邮件:1407106692@qq.com 联系网址:http://www.todaytex.com |
|||
|
公司:QUOTE 国家:** 联系人:** 地址: This is an inquiry message about QUOTE in the 108th China Canton Fair. (这是一条买家关于"QUOTE"的询盘信息,来自第108届中国广交会。)Inquiry Message (询盘信息) QUOTE Dear Sir; We wish to inform you that SMI is a subsidiary of the MANAGEM group which is the first operator in the mining sector in Morocco “please see our web site: www.managem-ona.com , SMI produce silver ingots with high purity. Actually SMI would like to modernize the foundry equipments, and we are interested to receive your offer for this project. The provision is to provide a turnkey unit that could be resolve the problems encountered at the actual foundry. In order to give you more idea about the existing unit and about future installation requirements, there are some technical information’s: Product to be treated “feed “: The feed of the foundry is composed by 3 types of ore: *The cement of silver: represents 73% of the feed: this product under 62% Ag, 1.46% Pb, and 3.46% Hg *Silver Chloride”AgCl”: represents 21 of the feed % *Gravimetric concentrate: 6% of the feed: humidity ranges from 4 to 15%, silver content: 50%, the mercury Hg is 15% Description of the existing melting unit: 1/ the first operation is for eliminate mercury and humidity, this stage is assured by roosting at 700°C in the static furnace “four statique à mouffle” 2/the second operation is a melting at 1100°C in a crucible furnace , at the end of this operation 2 products are obtained ingots semi finished containing 95% of silver and slag which will be isolated. 3/The 3rd step is a melting of ingots semi finished in a Reverber furnace, in the presence of air injection in order to oxidize impurities such as Pb and zinc, the product obtained at the end, are silver ingots with 99% of silver “ingots of 250kg” 4/The last step is a melting in order to reduce the weight of ingots to the weight demanded by the customer “9Kg”, the operation takes place in a crucible furnace. Objective of the project of modernization of the foundry: *Reduce the number of existing furnace. Collect the maximum operating in a single furnace *Produce directly ingots 9 kg. *The furnace to propose must be capable of produce 10Tonnes of silver by shift, the installation will be operated two to three times per month . *A circuit of aspiration and washing gases should be proposed “especially for mercury "", the emission should be conforming to European standards. *The feeding operations and unloading of the furnace must be mechanized. Please send us as soon as possible your proposal with maximum information on the technology applied by your engineering services for the different. If you need more technical information on the ore or other question helping you to quote, please don’t hesitate. Best regards Mr TANNAOUI ABDELLAH Département Etudes/Procédés Reminex / Managem / Groupe ONA Twin Center, tour A angle boulevard Zerktouni et Al Massira Al Khadra BP5199, Casablanca, Maroc (direct phone: +212 22 95 67 83 ècell phone: +212 48 86 87 65 ? e-mail: tannaoui@managem-ona.com Contact Info (联系信息) Tannaoui abdellah Twin Center, tour A angle boulevard Zerktouni et Al Massira Al Khadra BP5199, Casablanca, Maroc casablanca20000 MAR Company: managem E-mail: tannaoui@mangem-ona.com tannaoui@mangem-ona.com 电话:** 传真: ** 邮箱:** 网址:** 采购本类产品及:** |
|||